Harbour West

One hundred and thirty two homes on the west quay, with the dock wall kept as the sea defence.

Harbour West under construction on the quay, a six storey frame in scaffold beside the old dock wall
The Harbour West frame and tower crane rising above the quay and the stone dock wall

Place

Harbour West

Stage

On site

Type

Residential

Homes

132

Area

14,800 sq m

Completion

2027

Partners

Northbank Partners

Harbour West is the largest scheme Kinross has taken on. The quay had been derelict since the fish market closed, and the dock wall needed eleven months of repair before a single foundation went in.

The first two blocks topped out in March. Handover of phase one is set for the spring of 2027, with the public quayside opening at the same time.

What we kept

The dock wall repaired and reused as the sea defence rather than replaced.

A section of the granite dock wall, freshly repointed, with a steel ladder and mooring ring
New brickwork beside a wet concrete edge, the mortar not yet cleaned off